Contractor Bid Calculator
- Materials
- Wages
- Labor burden
- Subs & equipment
- Overhead
- Profit
Bidding below $9,098.80 loses money on this job. Overall, the bid is 26.5% above direct cost.
Turn this into a quote
A one-page PDF for your customer, filled in from the numbers above. Your markup isn't shown.
How the contractor bid calculation works
Labor cost = hours × wage + labor burden
Burden is what an hour costs you beyond the wage: payroll taxes, workers' comp, insurance and benefits. 80 hours at $28 is $2,240; a 30% burden adds $672, for a burdened rate of $36.40 an hour.
Direct job cost = materials + labor + subs
This is job costing: every cost you can trace to this job. $4,000 + $2,912 + $1,000 = $7,912.
Add overhead as a % of direct cost
Overhead keeps the business running between jobs. 15% of $7,912 is $1,186.80, so the break-even price is $9,098.80.
Add profit, and know whether it is markup or margin
A 10% markup on cost adds $909.88 for a $10,008.68 bid, but that is only a 9.1% margin on the price. To keep a true 10% margin, divide cost by 0.90 instead: $10,109.78.
Worked example. Materials $4,000, 80 labor hours at $28 with a 30% burden ($2,912) and $1,000 of subcontractors give a direct cost of $7,912. Adding 15% overhead ($1,186.80) makes the break-even price $9,098.80. A 10% markup brings the bid to $10,008.68, with $909.88 profit, a 9.1% margin.
Contractor Bid FAQ
What is labor burden?
The cost of an employee on top of their wage: employer payroll taxes, workers' compensation, unemployment insurance, health and other benefits, and paid time off. It is usually expressed as a % of wages.
How do I calculate labor burden?
Add up a year of payroll taxes, workers' comp, insurance and benefits, then divide by the wages paid. $18,000 of burden on $60,000 of wages is a 30% burden rate.
What is the difference between markup and margin on a bid?
Markup is profit ÷ cost; margin is profit ÷ bid price. A 10% markup on a $9,098.80 cost is only a 9.1% margin, so pricing with markup when you mean margin leaves money on the table.
What is job costing in construction?
Tracking every cost a job uses (materials, labor with burden, subcontractors and equipment) so you can price the next bid and check whether this one made money.
What is a typical labor burden?
There is no single construction figure, but two references help. Employer FICA alone is 7.65% of wages (6.2% Social Security on wages up to $184,500 in 2026, plus 1.45% Medicare). For a national benchmark across all private industry, the BLS reports that in June 2026 employers paid $14.07 an hour in benefits on top of $32.82 in wages, about 42.9% of wages. BLS counts paid leave as a benefit; if you keep paid leave inside wages, your rate will be lower. The 30% on this page is only an example input.
What is a fully burdened labor rate?
The hourly wage plus labor burden: wage × (1 + burden rate). $28 an hour with a 30% burden is $36.40. Some contractors also load overhead into the hourly rate; adding 15% overhead gives $41.86 an hour. This calculator keeps overhead as a separate line so you can see it.
What does overhead and profit mean in a bid?
Overhead is what it costs to run the business between jobs: office, vehicles, insurance, software and admin time. Profit is what is left after every cost, including overhead. Overhead is added on direct job cost, then profit is added on top of that break-even price.
How much overhead and profit should a contractor charge?
No government or standards body sets a percentage. Your overhead rate should come from your own books: last year's overhead divided by last year's direct job costs. You will often hear '10 and 10' (10% overhead plus 10% profit), especially in insurance repair work; treat it as an example, not a rule. On the $7,912 direct cost here, 10 and 10 gives $791.20 overhead, $870.32 profit and a $9,573.52 bid, which is 21% above direct cost, because the profit is added on cost that already includes overhead.
How do I bid a construction job?
Price materials and subcontractors from quotes, estimate labor hours and multiply by your fully burdened labor rate, add overhead as a % of those direct costs, then add profit. Never bid below the break-even price.